SHANCO CASE STUDIES
Discover the detail behind the challenges and outcomes of recent Shanco projects.
EXPLORE OUR PROJECTS
Our projects are delivered consistently, professionally and nationwide.
Shanco Case Studies
Our case studies section showcases diverse projects, highlighting our innovative solutions and the tangible results achieved in enhancing infrastructure and client satisfaction.
May 19, 2026
Shanco delivered complex groundworks for a new modular healthcare facility at Addenbrooke’s Hospital in Cambridge, working within a live hospital environment beside emergency access routes.
May 19, 2026
Shanco completed the full groundworks package at Crompton House School in Oldham, supporting a new £5.7m modular school with enabling works, foundations, drainage, services, a MUGA, car park and access road.
May 13, 2026
As part of its commitment to sustainability, the MOJ built a new 30-space car park with integrated street lighting and EV charging points alongside Shanco’s simultaneous works within the facility. This case study outlines the planning, design and implementation of the project, highlighting the benefits and challenges faced during its execution.
April 27, 2026
Shanco completed a £2.4m package of site-wide services and groundworks at HMP Sudbury, keeping the site operational while managing access, security controls and changing service routes.
April 22, 2026
Shanco delivered a £500k bulk oil storage project for Kerfoot Oils in Goole, completing reinforced concrete and piling works at a live port site while keeping operations running.
April 20, 2026
Shanco delivered reinforced concrete works for Naylor Group’s new Barnsley manufacturing facility, including extrusion bays, channels and a waste disposal system.
March 19, 2026
See how Shanco reduces excavation risk through specialist training, ground penetrating radar surveys and Vac-Ex technology for safer, controlled groundworks.
March 10, 2026
Shanco partnered with Galliford Try in constructing Greenhead Sixth Form College's Net Zero Carbon in Operation (NZCiO) school building as part of a £25m redevelopment under the Department for Education's School Rebuilding Programme.
February 4, 2026
Shanco delivered a £1m enabling works and groundworks package at St. George’s Hospital, Tooting, supporting a new modular MRI unit in a highly constrained live hospital environment. Works included investigation and service diversion for a live HV cable, CFA piling and off-site prefabricated pile caps/beams, and a 600m² reinforced slab, delivered ahead of programme with minimal disruption.