SHANCO CASE STUDIES
Discover the detail behind the challenges and outcomes of recent Shanco projects.
EXPLORE OUR PROJECTS
Our projects are delivered consistently, professionally and nationwide.
Shanco Case Studies
Our case studies section showcases diverse projects, highlighting our innovative solutions and the tangible results achieved in enhancing infrastructure and client satisfaction.
June 11, 2024
Shanco was appointed to provide the external hard landscaping, drainage/attenuation & new services for this project in Seacroft, Leeds.
May 12, 2024
Discover how groundworks for a hospital's new modular building achieved a three-week turnaround, revolutionising healthcare infrastructure construction.
May 7, 2024
This case study will highlight the successful completion of the site-wide service trench within the programme, resulting in positive feedback from the site manager.
April 30, 2024
As part of its commitment to sustainability, the MOJ built a new 30-space car park with integrated street lighting and EV charging points alongside Shanco’s simultaneous works within the facility. This case study outlines the planning, design and implementation of the project, highlighting the benefits and challenges faced during its execution.
April 23, 2024
St. George's Hospital, located in Tooting, South London, worked with Shanco on a significant expansion project to maintain the hospital's high standard of patient care and accommodate the growing healthcare needs of the region.
April 22, 2024
Discover Shanco's achievements in expanding the HMP Category D facility, overcoming complex engineering challenges to deliver high-quality work while prioritizing safety and efficiency.
April 16, 2024
Located in Cambridge, Addenbrooke’s is a renowned teaching hospital and research centre in Cambridge. Appointed by ESS Modular, Shanco was responsible for the groundworks for a new modular building designed to support patients with chronic illnesses. The new facility was constructed on the site of a former car park and between two existing buildings in the heart of the hospital’s complex.
April 9, 2024
As part of the redevelopment of North Manchester General Hospital, a new modular office has been created on-site. ESS Modular appointed Shanco to deliver the groundworks for the building which is located on an existing car park next to the estates department, south of the hospital.
April 2, 2024
Northmoor Academy in Central Oldham, Manchester, undertook a significant project to build a new 3FE (Three-Form Entry) primary school, accommodating 630 pupils. Shanco played a pivotal role in completing all groundworks and civil engineering infrastructure for the innovative modular Academy.