Currently the largest Hotel in Leeds, Bewleys Hotel is a prestigious development minutes from Leeds City Centre.
Shanco began construction on the complex substructure/superstructure in August 2002 faced with the initial task of constructing 3 floors of in-situ RC and 9 specially designed Precast floors.
“Shanco’s technical expertise has meant that problems have been spotted
and solved before they developed”
- Liam Hollywood, Project manager Ellen Construction 20/01/03
“We as Civil and Structural Engineers would highly recommend Shanco to
other parties on projects of a similar nature”
- Basil J Basray Beng(Hons) Ceng MIStructE MinstD, Structural Engineer Bewleys
Hotel, Leeds
Client: Ellen Construction ltd
Date: 2002 to 2004
Value: £1.5m
Shanco Engineer: Adrian Doherty